Camille likes to use the camera. Here is a little sampling of her work and the scenes she sets up.
Sunday, December 09, 2007
Fa la la la la, la la la la!
Hello! Sorry for the lapse - this has been a roller coaster month. In a nutshell, Gilles'
Aside from all of that, here are a few pics. Up top, Camille with the neighbors Lila and Plume who spent the night recently. The middle shot is a view of the trench for the pipes from the house to the basins - that's hooked up and working! Gilles is busy gathering reeds, papyrus, and other aquatic plants from various plant gurus in the community. A neighbor dug the trench for us with his digger tractor in about a half an hour! It took us three days to fill it back up.
Last but not least, our Christmas tree during the decorating. Gilles cut it in the woods with the girls and they said a little prayer of thanks. We are lucky to live in a place where the pine trees need thinning! Camille picked a little baby one which is decorated in her room. In the car on the way home, Camille swore she heard the big tree talk, and it said "I'm scared of that monster next to me." The monster, Camille later explained, was the saw.
Sunday, November 11, 2007
stones and pebbles
Halloween has come and gone. People in France are aware of Halloween to varying degrees, but I must say most the folks in our village are very good sports, especially considering the use of firecrackers by the older kids and the adaptation of "Trick or Treat" as "Des bonbons ou la mort" ("Candy or Death!"
Below, there I am emptying buckets of pouzzolane (volcanic pumice stone) into the basins, covering the layer of river stones underneath. For those following the technical aspects of this project, the big top basin works as a vertical filter with the biggest stones on the bottom and smaller ones on top. The second and third basins are horizontal fliters, with the river stones at the fluid arrival and departure points, and smaller stones in between. There have been many fiascos with these stones, and it felt great to, at long last, get them to their final destination. Yeehah!
Thursday, October 25, 2007
chestnut factory
Also, an update on the blackwater basins - the stones on the basin itself are "glued" on with cement. The adjoining stone wall will allow us to build up the earth there to create a more level play area.
sunflowers
Our 1/8 violin came in the mail - how adorable is that. L and C both are interested in bowing. Maybe down the road I will introduce the finger positions, but so far getting a nice sound with a big arm is all we're aiming for. Below, a crepe lunch with the neighbors one no-school Wednesday, and part of our sunflower crop.
flash from the past
3 years old!!
Here's the birthday girl with her cake on the evening of her real birthday, and getting ready for her party the next day. We went all out with the decorations! Unfortunately, I do not have a single shot of the party itself - I sure had my hands full
Tuesday, October 16, 2007
sillies
summer days
Misty gray kitty
fizzy drink
Sunday, September 30, 2007
blackwater treatment system
This is our major project lately. G has masterminded this whole affair, but I got to help this week with some earth moving and pipe rigging.
Subscribe to:
Posts (Atom)

